PNC Delhi Industrialinfra Pvt. Ltd will take care of the entire storm water drainage system of the area and will focus on Re-construction, Rehabilitation and Repairs of the existing damaged storm water drainage network, which comprises of nearly 55,300 m length of drains in various sizes and cross sections chiefly made of Brick Masonry. In addition to it, we will also do planning and construction of 40 Nos. of rainwater harvesting structures at various locations to improve the ground water level of the area and save the environment.